Power and Grid Intelligence

Find power
before it's gone.

TerraNode indexes every interconnection queue application, transmission upgrade, and infrastructure signal across the US grid — so you find viable data center sites before your competitors do.

147 million US parcels. 260,000+ queue applications. All 7 ISOs. Live.

The constraint

The real bottleneck is not land. It is power.

ERCOT alone has 230+ GW of pending interconnection requests — 2.5x the entire installed capacity of the grid. Microsoft, Google, Amazon, Meta, and xAI have collectively committed over $300B in data center construction through 2028. They are all competing for the same thing: power access at scale, fast.

The firms that win are the ones who know which substations have capacity, which corridors have transmission planned, and which queue positions are real — before anyone else does. That intelligence does not exist anywhere in a single platform. Until now.

ERCOT pending queue

vs. 90 GW installed

230+ GW

Hyperscaler capex committed

through 2028

$300B+

ISOs indexed by TerraNode

CAISO, SPP, ERCOT, PJM, NYISO, MISO, ISO-NE

7 of 7

Queue applications mapped

with developer entities identified

260,000+

The platform

Every signal that matters. In one place.

The questions investors and developers ask about every site — TerraNode answers them automatically, before you ask.

Interconnection Queue

Every application across all 7 ISOs — MW requested, substation, developer entity, expected energization date, queue position. Shows where power is already spoken for.

Transmission Intelligence

Live HIFLD transmission corridors, planned upgrades from PUCT and ERCOT filings, substation capacity estimates, and congestion signals by node.

Developer Entity Identification

Who filed each application? Which hyperscaler has capacity reserved at which substation? TerraNode maps developer names to queue positions across ERCOT, NYISO, and ISO-NE.

Nuclear Suitability Index

The only automated nuclear site scoring system. Rates every US site on cooling water, transmission access, population density, seismic risk, and permitting environment.

Community Sentiment

11 data sources monitored by AI — detecting local opposition signals 3 to 6 months before they surface at public hearings. The single biggest deal-killer in data center development.

Environmental and Risk Stack

FEMA flood, wetlands, wildfire, seismic, endangered species, EPA air quality, water rights — computed automatically for every site in the database.

Find Site

Filter 147 million parcels by what actually matters.

Set your MW requirement, state, acreage, and substation proximity. TerraNode returns ranked parcels with full infrastructure profiles — substation distance, queue congestion, fiber, water, incentives, risk scores — instantly.

Open Find Site
Deliverable MW per site
Substation distance and voltage
Interconnection queue congestion
Fiber and water availability
Opportunity zone and tax incentives
Community sentiment and risk
Nuclear and hydrogen suitability
AI natural language search

What you don't have to do yourself

Every data source you'd need — already pulled.

FEMA, HIFLD, EPA, FCC, USGS, Census, ISO queues — 40+ federal and regulatory sources, normalized and enriched into a single score for every parcel.

147M+

US parcels indexed

53

Enrichment layers per parcel

7 of 7

US ISOs indexed

260,000+

Queue applications mapped

HIFLD Transmission Lines

Official federal dataset

ERCOT GIS Queue

1,874 applications with entities

EPA eGRID Carbon Data

Grid emission factors by region

Census ACS Demographics

Workforce + population radius

FCC Broadband Data

Fiber provider counts by census block

FEMA National Risk Index

Hazard + social vulnerability

USGS Seismic Hazard

Ground motion probability

GBIF Species Habitat

Endangered species proximity

Open-Meteo Climate

30-year climate normals per site

Also available

Transaction Intelligence

Pricing comps from undisclosed and off-market data center land deals — benchmarks for when the market gives you nothing to work with.

View comps

Latest Intelligence

Grid analysis, site selection methodology, and infrastructure market research.

All posts

The grid is moving fast. Get ahead of it.

Filter 147 million US parcels by MW requirement, substation proximity, and queue congestion.

Find a site