Power and Grid Intelligence
TerraNode indexes every interconnection queue application, transmission upgrade, and infrastructure signal across the US grid — so you find viable data center sites before your competitors do.
147 million US parcels. 260,000+ queue applications. All 7 ISOs. Live.
The constraint
ERCOT alone has 230+ GW of pending interconnection requests — 2.5x the entire installed capacity of the grid. Microsoft, Google, Amazon, Meta, and xAI have collectively committed over $300B in data center construction through 2028. They are all competing for the same thing: power access at scale, fast.
The firms that win are the ones who know which substations have capacity, which corridors have transmission planned, and which queue positions are real — before anyone else does. That intelligence does not exist anywhere in a single platform. Until now.
ERCOT pending queue
vs. 90 GW installed
Hyperscaler capex committed
through 2028
ISOs indexed by TerraNode
CAISO, SPP, ERCOT, PJM, NYISO, MISO, ISO-NE
Queue applications mapped
with developer entities identified
Find Site
Set your MW requirement, state, acreage, and substation proximity. TerraNode returns ranked parcels with full infrastructure profiles — substation distance, queue congestion, fiber, water, incentives, risk scores — instantly.
Open Find SiteWhat you don't have to do yourself
FEMA, HIFLD, EPA, FCC, USGS, Census, ISO queues — 40+ federal and regulatory sources, normalized and enriched into a single score for every parcel.
US parcels indexed
Enrichment layers per parcel
US ISOs indexed
Queue applications mapped
HIFLD Transmission Lines
Official federal dataset
ERCOT GIS Queue
1,874 applications with entities
EPA eGRID Carbon Data
Grid emission factors by region
Census ACS Demographics
Workforce + population radius
FCC Broadband Data
Fiber provider counts by census block
FEMA National Risk Index
Hazard + social vulnerability
USGS Seismic Hazard
Ground motion probability
GBIF Species Habitat
Endangered species proximity
Open-Meteo Climate
30-year climate normals per site
Also available
Pricing comps from undisclosed and off-market data center land deals — benchmarks for when the market gives you nothing to work with.
Grid analysis, site selection methodology, and infrastructure market research.
TerraNode is a platform purpose-built for data center site selection — combining 5,000+ listings from 8 sources, 16 automated enrichment layers, and 4 scoring indices designed for the AI infrastructure era.
Data center developers spend $300K-$1M+ and 6-18 months per site acquisition. We break down every cost category — and show how standardized site intelligence eliminates the most expensive inefficiency: evaluating sites that never had a chance.
$64B in data center projects have been blocked or delayed by community opposition. Community Sentiment Intelligence analyzes 139,000+ municipal meeting transcripts to score jurisdiction receptiveness — before you commit capital.
Filter 147 million US parcels by MW requirement, substation proximity, and queue congestion.